Project Overview
Worked with our customer to update, design, fabricate, and install a complex 41’ mixer assembly with a new pivot bearing and shaft. Finch provided the installation team and had an engineer on-site to manage the installation and test the mixer. This is the second mixer we have supplied to this customer.
Project Specifications
- Site visit and preliminary drawings
- Provide final design drawings for customer approval
- Fabricate 2-piece mixer assembly with flanged arms and pivot bearing
- Provide all hardware
- Remove gearbox, coupling, and old mixer assembly
- Install assembly and replace gearbox seal
- Provide rigging equipment, crane, tools, and confined space gas monitoring
- Run test and receive customer sign off